Media about us

2008 2010 2011

27.05.2011

Metso Corp - To Supply Minerals Processing Equipment And Services To Russian Copper Company In Russia

METSO CORP («MXTOF-0») — To Supply Minerals Processing Equipment And Services To Russian — Copper Company In Russia Metso will supply minerals processing...

27.05.2011

Metso Corp - To Supply Minerals Processing Equipment And Services To Russian Copper Company In Russia

METSO CORP («MXTOF-0») — To Supply Minerals Processing Equipment And Services To Russian — Copper Company In Russia Metso will supply minerals processing equipment and services to Russian Copper Company ZAO (RMK) for its copper operation in Chelyabinskya region in southwestern Russia. The service contract is for over 6 years and includes a team of more than 130 Metso on- site personnel and service parts supply. The complete value of the order is approximately EUR 200 million.

Under the equipment contract, Metso will supply a primary gyratory crusher, three cone crushers, two semiautogenous grinding mills, three screens and three ball mills for the new Mikheevsky GOK copper concentrator. The delivery also includes on-site supervisory services for the installation and commissioning, and on-site training for the Russian Copper Company’s operating personnel.

Metso’s life-cycle service contract includes maintenance, planning and operational assistance, process and product support services, as well as wear and spare parts and components for the comminution circuit. Metso will also maintain auxiliary equipment for the whole comminution circuit from the gyratory crusher to the hydro-cyclones.

The value of the equipment amounts to approximately EUR 75 million of the total order. The equipment deliveries will be completed within the third quarter of 2013. The total order will be included in Mining and Construction Technology Q2 orders received.

«The construction of Mikheevsky GOK is a project of federal significance and Russian Copper Company starts its implementation with full responsibility. We welcome participation of our old partner — Metso in this project», states Vsevolod V. Levin, President of Russian Copper Company.

According to Jerry Dubiansky, Vice President, Global Sales, Equipment & Systems business line, Metso «What makes this project so unique and really exciting for Metso, is that as we will not only be supplying the equipment but also maintaining it, assisting in the operations and being able to continuously monitor performance and efficiency. This arrangement offers maximum operating availability and minimizes operational risks, increasing the profitability of the project».

Mikheevsky GOK is a greenfield project by ZAO Russian Copper Company (RMK), which is Russia’s third largest copper producer. The company was founded in 2004. It produces copper concentrate, copper cathodes and copper rods from mineral and secondary raw materials. The startup of Mikheevsky GOK is planned for the third quarter of 2013, and the planned annual production is 18 million tons of copper.

Technical information

The equipment package includes a primary gyratory crusher designed for a capacity of 4,000 tons per hour and two comminution lines, each with a design capacity of 1412 tons per hour. The comminution lines consist of two large semi- autogenous mills, two large ball mills, heavy duty cone crushers for pebble crushing and a pebble grinding ball mill as well as double deck screens.

With life-cycle services, Metso will draw from its vast global experience with similar operations and the technical expertise of their product lines to deliver a high level of service to Mikheevsky GOK. The planning will be performed during the next 2 years after which Metso will maintain and assist in the operation of their comminution circuit for 6,5 continuous years on cost-per-ton basis. From the moment the equipment begins to operate, Metso will supply a fully tooled and trained team of over 130 people to Mikheevsky GOK.

http://metso.com/news/newsdocuments.nsf/web3newsdoc/F0FE214FA2A1248BC225789C00264C35?OpenDocument&ch=ChMetsoWebEng&

20.04.2011

Yurevich: Business development is a priority for Chelyabinsk region

Extracts from interview with Mikhail Yurevich about the results of his first year as a Governor of Chelyabinsk region.
RIA Novosti, 15.04.2011 15:42

20.04.2011

Yurevich: Business development is a priority for Chelyabinsk region

(...)

- As it was told before, there is the most polluted town of Russia and of the world in Chelyabinsk region, i.e. Karabash city. Has its image changed now?

- Karabash has been polluted since the beginning of the last century. The copper was extracted there by means of obsolete technologies and heaped up into the dumps. There were a lot of acid emissions. Karabash today is a rather old town and looks not so nice, but if you go there in summer, you can see that it is the remarkable place with wonderful nature. The blister copper furnace installed in Karabashmed is already up-to-date; there is a good sulphuric acid shop. The owner plans to update the enterprise and increase the number of working places.

The owner of the enterprise is Russkaya Mednaya Kompaniya, so I can say that after the reconstruction the emissions will be virtually eliminated.

Yes, the dumps have been accumulated in Karabash for the previous one hundred years, but they make no environmental damage of the region. To compare with the Soviet times they have been reduced by 10 times. The dumps are actively processed by the business owners, and I think that during three or five years the dumps will be completely processed.

I do not believe Karabash to be a problem place. I think, in future it will be a normal place from the ecological point of view, assuming that the conditions are wonderful there.

(...)

The full version of the interview is available here здесь:

http://www.rian.ru/interview/20110415/364870664.html

Freedback

Aleksandr Khanin
PR department head

Tel.: +7 (343) 365-29-33
Fax: +7 (343) 365-29-33

Olga Sterlyadyeva
PR consultant

Tel.: +7 (343) 365-29-33
Fax: +7 (343) 365-29-33

Freedback
Feedback